BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20230905T170000Z
DTEND:20230905T190000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Stockton's East Water District: Sodium Hypochlorite Ribbon Cutting
DESCRIPTION:Stockton East Water District (SEWD) has completed construction of a new sodium hypochlorite disinfection facility (Facility) at the Dr. Joe Waidhofer Water Treatment Plant.\n\n\n\nThe new Facility is finishing equipment start-up procedures and is expected to be fully operational by September 1. The Facility allows SEWD to disinfect treated drinking water with high strength bleach\, a safer alternative to the gaseous chlorine used for more than 45 years.\n\n\n\nTo commemorate this momentous achievement\, SEWD and the Greater Stockton Chamber of Commerce will be holding a ribbon cutting event on September 5 at 10:00am.
X-ALT-DESC;FMTTYPE=text/html:<span style="font-size:14px\;"><span style="font-family:arial\;"><span style="text-align:justify\;">Stockton East Water District (SEWD) has completed construction of a new sodium hypochlorite disinfection facility (Facility) at the Dr. Joe Waidhofer Water Treatment Plant.<br />\n<br />\nThe new Facility is finishing equipment start-up procedures and is expected to be fully operational by September 1. The Facility allows SEWD to disinfect treated drinking water with high strength bleach\, a safer alternative to the gaseous chlorine used for more than 45 years.<br />\n<br />\nTo commemorate this momentous achievement\, SEWD and the Greater Stockton Chamber of Commerce will be holding a ribbon cutting event on September 5 at 10:00am.</span></span></span>
LOCATION:6767 East Main Street Stockton\, CA 95215
UID:e.2412.5074040
SEQUENCE:3
DTSTAMP:20260510T090119Z
URL:https://app.stocktonchamber.org/events/details/stockton-s-east-water-district-sodium-hypochlorite-ribbon-cutting-5074040
END:VEVENT

END:VCALENDAR
